Welcome Thai Warehouse Clients to Visit Dorian Factory and Discuss Project Details

Project dimension: 25*60*12.3m

Project location: Thailand

Project function: Warehouse with a two-floor office building

On October 20, Dorian warmly welcomed four Thai clients. We first met them at the IMPACT exhibition in Thailand at the end of April,provided a preliminary quotation and kept consistent follow-up afterward. The preliminary drawing design had been completed prior to their factory visit.

Dorian picked up the clients at the high-speed railway station. We enjoyed authentic Luoyang local cuisine together and visited Yingtian Gate on their first day.

Three people pose for a photo at a lit historic complex at night.
Group portrait in front of illuminated traditional buildings during night visit.

Early the next morning, the clients arrived at our factory together with Dorian’s Thailand-based engineer. We first held a dedicated technical meeting. Our professional engineers answered all the client’s questions one by one, and both sides reviewed and discussed the project drawings. The clients expressed high satisfaction with the design scheme.

During the meeting, Dorian went through multiple design optimizations for the project.

1.The client preferred a neat exterior with no exposed fasteners and good thermal insulation. Dorian recommended horizontal installation of rock wool PU panels instead of the conventional vertical layout.

Steel building exterior panels with sunlight reflection.
Dorian Factory steel structure facade with branding visible on panels.

2.To achieve a cleaner look and hide the ridge, a 1.6m parapet wall was proposed.

Cross-section drawing of a steel building frame with dimensions and material notes.
Engineering cross-section of a steel structure showing wall panels, steel columns, and roof frame with measurements.

3.Continuous louver vents and windows were designed to improve natural ventilation and daylighting.

Modern steel building exterior with large windows and gray panels.
Industrial steel structure building with extensive glazing under clear sky.

4.For the office building, to make it easier for the client to create decorative shapes in subsequent finishing work, Dorian suggested brick walls, and Dorian will only provide the steel frame.

Steel building wall elevation with sections and grid lines for structure and paneling.
Elevation view of a steel building facade showing paneling, brick texture, and support elements.
Group of professionals in a formal meeting around a wooden conference table.
Team discussion at a steel-building company office setting with laptops and documents.

After the meeting, Dorian escorted the clients to tour our steel structure workshop. They were impressed by the scale of our factory. We walked them through the whole production process, which gave them a direct perception of our manufacturing capability and built solid trust in Dorian.

Group of visitors wearing hard hats inspecting steel beams in a warehouse.
Visitors in hard hats examine steel structures inside a warehouse facility.

ILater, we took the clients to visit a completed reference project which largely matches their requirements. Seeing this finished project helped the clients clearly visualize what their own project would look like upon completion. This site visit greatly boosted their confidence in Dorian’s capacity for design, fabrication and project delivery, and played a vital role in pushing the order forward.

Modern steel building exterior with large glass windows under a clear blue sky.
Modern steel structure building with construction materials nearby and a clear blue sky.

On the morning of October 22 before their departure, the clients visited Dorian’s downtown foreign trade office to recheck the proposal and confirm the order with Dorian. After lunch, Dorian sent them to the high-speed railway station. The clients shared that they had an excellent trip.

Three people posing with a certificate in a meeting room.
Team members celebrate a certificate during a visit to Dorian factory.

After returning to Thailand, the clients maintained close communication with us. Dorian received the deposit on November 4, and the project is now progressing smoothly.

Please feel free to contact Dorian if you have requirements for prefabricated steel buildings. We provide one-stop services including customized design, fabrication and installation support.