Completed Libya 2592 Square Meters Steel Bar Rolling Mill Production Line 3

Completed Libya 2592 Square Meters Steel Bar Rolling Mill Production Line

The project was totally done in the first week of June, which took about 1 month and half in total.

This Libya project is a L shape building, while there are 2 parts of them.

The longer building is with the size of 60x24x15.5m, which is used as the stove workshop. This height can make sure the safety for the high temperature. There are 3 doors space reserved on the gable wall which are in order to loading the materials to the stove inside the building.

There are 2 cranes are mounted inside the workshop, while 1 is 10 tons and another is 15 tons.

The lower part building will be used as the rolling part, which is used for conveying and loading the rebar. Therefore, this part of the building no need to be very higher. With the size of 24x24x9m, this part will be reserved some space for the Phase II of the project. The second phase of the project will be for the finished product workshop, which is also as the rolling part. And the size for this part is 24x90x9m, which will be connected together with the existed 24x24x9m part.

On June 21, the project had been totally done.

You can check Before Shipping parts of this project at here:
You can check Shipping and Pre-installation parts of this project at here:
You can check Final parts of this project at here:

    China-co-Germany-1

    Dorian Accomplish 3600 Square Meter Two-story Steel Workshop Project in Colon City, Germany

    Project information

    Project information: 3 sets 40X30X14M two-story pharmaceutical steel structure workshop with PU sandwich panel wall + glass wool roof

    Project location: Colon city, Germany

    Consultation before the cooperation

    Dorian made the design as the usual after received the inquiry from the client, and the design drawing only spent 3 hours to be finished, and sent it and detailed price list to the client. The client was amazed at Dorian’s efficiency. But, due to the demand of a lot of precision instruments and equipment in the workshop, the client has high requirements of fireproof function for the steel structure and panels. On the other hand, winter in Europe is such cold, therefore,Dorian suggested that paint fireproof coating on the surface of steel structure and use PU sandwich panel as the roof panel and wall panel, which can greatly improve the fireproof level and thermal insulation function as well as anti-corrosion.

    The client was pleased with Dorian’s suggestion, but they refused the price because of some force majeure such as continuously rising freight rates and unpredictable shipping schedules ,and other reasons. Dorian has to modified the design and recommended glass wool sandwich panel instead of the PU panel, which is also with good insulation function and more economical price. In additions, the glass wool has smaller volume, which can save the container space when loading, and finally save shipping cost. After a tough but pleasant negotiation, the client accepted Dorian’s solution and price eventually.

    A visit prior to the formal cooperation

    Considering that it was the first cooperation, before paying the deposit, the client asked their colleagues in Shenzhen office to visit Dorian’s factory. After a long journey, Dorian team picked up the clients at the high-speed railway station and had a pleasant meeting with them. The customer have a site work of the production plant and have a detailed consultation with the engineers and designers during the visit. After that, the client recognize the Dorian's strength and service, was more tend to cooperate with Dorian’s team and Dorian’s factory.

    Installation

    Dorian also can provide installation service based on the demand of the client, but because of the covid-19, the client has to give up the service which invite Dorian’s installation team to their city to help them install the steel structure workshop. Dorian reassured the client quickly, and in order to guarantee the smooth installation of this engineering, made detailed installation manual and installation video in time before they received the cargoes. Meanwhile, Dorian also provided professional on-line service to the client to solve any problems that arise during the installation process. now the steel structure workshop has been successfully installed under Dorian’s help, the workers are decorating and installing the equipment.

    Final reminder

    Dorian can produce all kinds of steel building, metal sheet and sandwich panel on China ,have professional research and development team and rich experiences with more than 20 years , and also provides one-stop service from designing, manufacturing to loading and installing . For more information, please send us email or contact us freely.