The project of this 3,000 square meters steel structure warehouse building is located in Ghana.
Projects details: 36*42*8m+36*42*6m steel structure workshop for tyre recycling plant.
Projects Execution: Q335B welded steel structure beam and column with 0.4mm single layer steel sheet with industry gray color for wall and roof. Skylight panel and ventilator ball on roof for natural lightening and ventilation. Electronic rolling up doors for truck entering.
Dorian Steel Structure finished the loading and delivery work to Ghana, Africa with two units steel structure warehouse in total 3000 square meters in Dec,2020
Customer asked for the design and quotation with the local prefab steel structure manufacture in Ghana initially, and preferring to set up this project with them due to the severe global COVID virus issue.
After investigating Dorian’s price,capacity and service, customer changed their mind to cooperate with us finally.
Customer monitor the mass production and loading process by instant video talking with Dorian’s Sales Team even though he can not do the inspection work in site.
Dorian packed the goods with 40OC container and loaded carefully with crane, every parts was placed in the proper position without any damages.
Using the steel rope to make the fixation and minimize the risky of damage caused during the transportation process.
All the steel columns and steel beam with the embossed stamp according to the Assembling Layout indication, which will help the customer to do the installation work correctly afterwards.
Customer is happy and satisfied with Dorian’s service and quality after receiving the goods in Jan,2021.