1000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 00

1000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand

Project Name: Aluminum Alloy Window Production Plant
Dimensions: 15m (width) x 65m (length) x 10.15m (height)
Location: Bangkok, Thailand

Project Overview:
Dorian team is proud to present the steel structure warehouse solution designed for client’s aluminum alloy window production business in Thailand. The warehouse, measuring 15m (width) x 65m (length) x 10.15m (height), is tailored to meet production needs while combining functionality, durability, and aesthetic appeal.

Single-Slope Steel Frame with Parapet Walls:

The steel structure features a single-slope design, enhanced by parapet walls on all sides for a sleek and modern appearance.The steel beams and columns are painted in a vibrant orange-red color, adding a professional and visually appealing touch. Moreover,Louvers are installed around the walls to ensure proper ventilation, creating a comfortable working environment.

The roof and wall panels were designed with classic gray metal sheet, providing a cohesive and professional look.

A 3-ton overhead crane was also supplied by Dorian to facilitate the movement of window materials and streamline the production process.

Efficient Drainage System:

Gutters and downpipes are also installed along the eaves to ensure effective rainwater drainage, protecting the structure and maintaining a dry interior.

 

Convenient Access and Maintenance:

Two electric roller shutters are installed for easy access to the warehouse. A ladder is provided at the rear of the building, allowing workers to safely access the roof for inspection and maintenance.

1000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 2

Production:

During the production phase, the client visited Dorian factory and were highly impressed by production scale, manufacturing capabilities, and product quality. To make the client’s trip more memorable, Dorian team arranged visits to Luoyang’s famous tourist attractions, including the White Horse Temple and Shaolin Temple. These experiences left a lasting impression and further strengthened our partnership.

1000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 31000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 4

Delivery and installation: The materials were finished in approximately 25 days and took about 10 days delivered to the project site.Dorian’s professional installation team was dispatched to complete the installation work for client. As of now, the entire steel structure installation has been successfully completed.

 Only the brick wall construction remains, which is being handled by local workers. The warehouse is expected to be operational within this month.

1000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 51000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 61000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 71000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 81000m2 Steel Structure Warehouse Solution for Aluminum Alloy Window Production in Thailand 9

Ongoing Collaboration:

New Energy System:

Dorian team and client is currently discussing a new energy solution for the finished 15*65*10.15m project.. The plan includes installing solar panels on the roof and providing a comprehensive system to enhance energy efficiency. The new energy technician is also being fine-tuned with client in Thailand and working on the final details.

 

5-Story Commercial Building Project:

The preliminary drawings and a quotation of 5-story commercial building project have been provided for client . The details are under further discussion and collaboration continues to grow.


Please do not hesitate to contact us If you need a steel structure project. Dorian engineer will customize the solution according to your project details.

Looking forward to continuing our successful partnership and supporting your business growth in Thailand and beyond.

    Datuk Derek Chong Leads Delegation to Dorian Factory, Strengthening Prospects for Malaysian & ASEAN Market Cooperation 1

    Datuk Derek Chong Leads Delegation to Dorian Factory, Strengthening Prospects for Malaysian & ASEAN Market Cooperation

    In February, Datuk Derek Chong, President of the Malaysian Henan Chamber of Commerce, led a distinguished delegation comprising members of the Malaysian Henan Chamber of Commerce, representatives from the Penang State Islamic International Management Agency, and the Principal of the Penang International Islamic Development and Sustainability Institute, to visit the Dorian factory.

    During the visit, Datuk Derek and Dorian’s management engaged in comprehensive discussions on future development plans, focusing on establishing a branch office in Malaysia to serve as a hub for the entire Southeast Asia and ASEAN markets. The talks highlighted Dorian’s breakthrough from ground zero in the Malaysian market and outlined prospects for deeper future cooperation. Additionally, Datuk Derek announced plans to develop an industrial park in Penang, with Dorian slated to provide architectural design, as well as production, transportation, and installation guidance. Detailed project plans will be presented in due course.

    Datuk Derek Chong Leads Delegation to Dorian Factory, Strengthening Prospects for Malaysian & ASEAN Market Cooperation 2Datuk Derek Chong Leads Delegation to Dorian Factory, Strengthening Prospects for Malaysian & ASEAN Market Cooperation 3

    Following the discussions, the Dorian team led the delegation on a tour of the production facility. The visit included detailed introductions to the five prefabricated steel structure production lines, a steel structure bridge production line, a large-scale building production line, and the maintenance workshop. The guests expressed high praise for Dorian’s robust production capabilities and exceptional product quality, and they conveyed a strong desire for Dorian to expedite its entry into the Malaysian market.

    Datuk Derek Chong Leads Delegation to Dorian Factory, Strengthening Prospects for Malaysian & ASEAN Market Cooperation 4Datuk Derek Chong Leads Delegation to Dorian Factory, Strengthening Prospects for Malaysian & ASEAN Market Cooperation 5Datuk Derek Chong Leads Delegation to Dorian Factory, Strengthening Prospects for Malaysian & ASEAN Market Cooperation 6

      Dorian attends the 25WORLDBEX 2025

      Dorian attends the 2025 WORLDBEX | The Philippine World Building and Construction Exposition

      We, Dorian Group, an experienced Steel Structure Building solution provider, will attend the 2025 WORLDBEX Expo at World Trade Center Metro Manila, Philippines on March 13-16.

      With years of experience and expertise, we offer customized solution for steel structure buildings across various industries, including industrial, agricultural, commercial and etc. Our company’s core value includes smart design, high quality product and excellent after-service.

      We look forward to see you at the WORLDBEX Expo and forging a prosperous future together!

      Exposition Center: World Trade Center Metro Manila

      Booth No.: S905

      Date: March 13-16, 2025

      Address: SMX Convention Center, Manila, Philippines

      WORLDBEX | The Philippine World Building and Construction Exposition, began in 1996 and has had 27 successful sessions. It is now considered one of Asia's most significant and the largest building and construction exposition in the Philippines. It is a pillar of the country’s construction and design industry for its premiere and world-class trade presentations, serving as an indispensable platform in Philippines for showcasing new products, sharing up-to-date information, and exchanging the latest industry technology .

        800 Square Meters Steel Structure Warehouse in Thailand 1

        800 Square Meters Steel Structure Warehouse in Thailand

        Project information: Project location: Thailand Project size: 16X46X7.5-9m Project application: Warehouse Project details: single-slope structure + industrial gray single layer steel sheet for the wall and roof + skylight panel + 50mm rock wool sandwich panels for office mezzanine partition walls

        Background:

        In 2024, Dorian established a connection with the client at the Thailand Architect Exhibition. The client expressed plans to construct a steel structure warehouse for sales purposes. During the initial meeting, Dorian provided detailed introduction to manufacturing capabilities, and several completed projects in Thailand locally. Impressed by Dorian’s professionalism, attention to detail, and the quality of steel structures, the client decided to move forward with the project. 

        Project design:

        The project design was gradually confirmed through a series of meetings and on-site assessments, during, coupled with in-depth discussions on the client’s specific requirements and preferences. After careful consideration, the client decided to use single-layer steel panels for the wall and roof, for the need for better insulation, the colour was chosen to be industrial gray. Since Thailand has long hours of sunshine, and the dark color helps in reducing heat absorption. Meanwhile, in order to enhance interior lighting within the warehouse, the skylight panels were added on the roof. Given Thailand’s tropical climate, which is characterized by high temperatures and humidity, the 2m brick wall was designed which has the function of protection of steel warehouse.

        800 Square Meters Steel Structure Warehouse in Thailand 2800 Square Meters Steel Structure Warehouse in Thailand 3800 Square Meters Steel Structure Warehouse in Thailand 4

        Considering the office needs, the client requested to add a 5*10m mezzanine floor to serve as an office space on the side of a 7.5m high eaves wall. Dorian designed the office area’s internal partition walls using 50mm thick rock wool sandwich panels, which provide excellent thermal insulation. For the exterior walls, brick was chosen for its durability and thermal properties.

        This final design approach not only meets the client’s needs but also ensures comfort and durability, and it has been recognized by the client. By the middle of 2024, the client decided to purchase from Dorian, payment was completed in July.

        800 Square Meters Steel Structure Warehouse in Thailand 5

        Installation:

        The foundation plan was sent to the customer prior to shipment so that the foundation work has been completed before the customer receives the goods. Upon the cargo's arrival at the project site, the construction team finished the installation under Dorian's supervision and guidance. The erection process took only nearly one month. Then, Dorian’s electrical engineer provided guidance during the installation of the solar power system and ensured its connection to the grid.

        800 Square Meters Steel Structure Warehouse in Thailand 6

        Once production is completed, all steel frames are carefully placed on steel pallets, then using steel belt to fix the goods, which ensures the quality of the products during transportation. Additionally, the use of steel pallets makes the unloading process more convenient for the customer.

        800 Square Meters Steel Structure Warehouse in Thailand 7

        The installation of the project was finished by client’s local installation team. However, to ensure quality and precision, Dorian’s Thailand team, including engineers and salesmen, provided on-site technical guidance throughout every stage of the process—from foundation work to the installation of the steel structure, wall panels, and roof panels. The project will be put in use next month.

         

        For more information on steel structure building, please feel free to contact us.