This 700 square meters steel structure warehouse is located in Valparaiso, Chile. Project size: 20x35x6m steel structure warehouse to store excavator and other tools. Project instruction: Q355B welded steel column and beam, black paint, roof is 50mm EPS sandwich panel with green, wall is 0.5mm single layer steel sheet with black, roof skylight panel for natural light, big electric rolling door for excavator entering. In November 2023, Dorian finished production work of all materials and contacted client to deliver the goods. Client told Dorian team that they were still applying for the building permit, and no exact time to get the building permit. Considering the issue of storage, client wanted Dorian team to help purchase one container and deliver the whole steel frame to Chile first, and leave one container of cargoes at factory until they noted. According to the schedule of client mentioned, Dorian team transported the first container of cargoes to Chile in November 2023, this container includes steel column, steel beam, roof/wall brace/bracing, tie bar, angle brace, wall panel, electric rolling door and bolts. In April 2024, Dorian transported the second container of cargoes to client, includes 50mm EPS roof sandwich panel, roof/wall purlins, skylight panel, flashing, and some tools. All the delivery work are finished in April, 2024 and client will receive the goods in June. Foundation work plan to start in June, be finished within 40 days. Next step is to erect the steel frame in July, all the erection work will be completed within 2 months.