4800 square meter steel structure textile factory in Guatemala

Project information:

Project size: 48*100*10m

Project location: Guatemala city, Guatemala

Project application: Textile factory building

Dorian is pleased to be working with a leading textile manufacturer in Guatemala, known for its high quality products and enjoying strong local demand. In order to expand its business, the client inquired in March 2024 for a 48m (width) x 100m (length) x 10m (eave height) steel structure factory, which is dedicated to textile production.

Because the client has its own professional engineers team,so they designed the preliminary drawing and sent it to the Dorian team. Dorian team confirm the project details with client’s engineer, refining and optimizing it with a two-span solution for the 48m width based on local weather condition and cost efficiency.

 

Dorian engineer also designed 10% roof slope for this project, achieving a ridge height of 11.2m to meet functional and budgetary requirements. At the same time, Dorian’s engineers also added a gutter configuration on the top. The functions of the gutter are as follows:

 

1. Collect rainwater: It guides rainwater to the drain or sewer system through the shape and slope of the groove to prevent water from accumulating on the roof or penetrating into the building.

2. Waterproof protection: It plays a role in waterproof protection, effectively draining rainwater from the roof and reducing the time water stays on the building. This helps reduce the risk of water penetration and prevents water damage to building structures and materials.

3. Maintain building structures: By draining water in time, the gutter can maintain the stability and durability of the building structure.

4800 square meter steel structure textile factory in Guatemala 01

According to the customer's requirements, the Dorian team designed three walls with bricks rising 3 meters from the ground, then followed by color steel plates. And the remaining wall was full color steel plates. The top is made of thermal insulation rock wool board, which has the effects of thermal insulation, fire prevention, sound absorption and noise reduction.

 

In addition, the customer also added a more 40HQ 0.5mm thickness of color steel plate for his existing project. At the same time, the ventilation bridge and lighting panels are also arranged on the roof for better ventilation and better lighting during the day.

4800 square meter steel structure textile factory in Guatemala 02

Project Design:

The client inquired another building 50*40*6m initially in August, 2023. This new project needed to be attached with previous projects, so Dorian engineer designed 6.5m and 6.75m column spacing for side wall, 6.25m column spacing for the end wall, they were the same as last two projects. The wall of 1-Axis was already finished in the second stage(2021), and it would be shared with the current project.

The span layout was also designed into same as last two, twin span were designed in 50m side, 25m for each span, and two types gutter(metal sheet gutter and galvanized gutter) were designed. Galvanized gutter were placed in the middle of span, metal sheet gutter was placed in the two sides span to save cost.

4250 Square Meters Steel Warehouse In Cabiao Philippines 6-min

Delivery process:

All the goods were produced in 25 days. the customer asked Dorian to ship in mid-September due to the sea freight,. A total of 14*40HQ containers were used, 7 for the steel structure , 1 for color steel plates, and 6 for the insulated rock wool sandwich panels Dorian’s shipping team reinforced the goods well, keeping all the goods balanced and avoiding bumps and damage during transportation.

4800 square meter steel structure textile factory in Guatemala 054800 square meter steel structure textile factory in Guatemala 06

Smooth Installation & Future Collaboration

The goods arrived on-site by late October, before this, Dorian team already sent comprehensive installation guides, drawings, manuals, and instructional videos to the client.

Leveraging their skilled team, the client completed assembly in just 30 days, because the foundation work had been finished according to Dorian’s foundation drawing in advance —final project photos will be shared later. . 

4250 Square Meters Steel Warehouse In Cabiao Philippines 9-min

The client got the permission at the beginning of Oct, 2023. Based on his requirement, Dorian engineer modified the project size 50*40*6m into 50*45*6m finally, since he wanted expand extra 5x50m bay to be used as one big canopy. Besides, client asked Dorian for helping him to search 4pcs additional negative pressure fans, which can creates a negative pressure environment indoors and allows indoor air to flow outdoors, thereby eliminating indoor harmful gases and pollutants.

4800 square meter steel structure textile factory in Guatemala 074800 square meter steel structure textile factory in Guatemala 084800 square meter steel structure textile factory in Guatemala 09

This project has paved the way for ongoing discussions about additional steel structure ventures, reinforcing a trusted partnership

 

Pls don’t hesitate to contact us if you have requirement about steel structure, welcome to your inquiry freely!